"Vega" type fishing freezer trawler
project B-419


LIST OF VESSELS 


 In total 11 units were built  from 1973 to 1974 at Gdansk. Five trawlers of this type were built for Poland and six for Romania.
Purpose of the vessel:     - pelagic and ground fishing
    - production of frozen fish and fish meal
    - transport of processed cargo to port
Length OA (m) 88.30
Length BP (m) 80.00
Breadth extreme (m) -
Molded breadth (m) 15.00
Depth to upper deck (m) 9.75
Load draught, average (m) 5.40
Displacement (tonnes) -
Deadweight (tonnes) 1500
Gross tonnage / Net tonnage (register tons)
2660 / 1035
Main engines:

    - Main engine number, power (Bhp each)
1*3600
    - Main engine model
Sgoda-Sulzer 6 ZB 40/48
    - Speed of rotation (r.p.m.)
500
Shaft generators:

    - Shaft generator  model
-
    - Shaft generators number, power (kW each)
-
    - Speed of rotation (r.p.m.)
-
    - Rated voltage (V)
-
Auxiliary diesel generators:

    - Diesel engine number, power (Bhp each)
2*750
    - Speed of rotation (r.p.m.)
750
    - Engine model
Cegielski-Sulzer 5A 25
    - Generators number, power (kW each)
-
    - Generator model
-
    - Rated voltage (V)
-
Emergency diesel generator:
    - Diesel engine power (Bhp)
-
    - Speed of rotation (r.p.m.)
-
    - Engine model
-
    - Generator power (kW)
-
    - Generator model
-
    - Rated voltage (V)
-
Fish processing plant capacity:
    - Frozen fish (tonnes/24 hrs)
35
    - Fish meal plant capacity (tonnes raw-fish per 24 hrs)
35
    - Canned fish-liver (cans/1 hr) 500
    - Fish-liver oil (litres raw material per 1 hr) 300
Refrigerated cargo spaces number, total cubic capacity (cub. m) 3*1500
Fish meal hold (cub. m) 345
Fish oil tanks total cubic capacity (cub. m) 30
Ref. temperatures (C) -28
Refrigerants Freon 22
Derricks number, lifting capacity (tonnes) 4*2.0
Warping winch:

    - Type -
    - Drag force of the drum (ton-force)
8.0
    - Pulling speed (m/min)
120
    - Rope capacity (m)
3000
Fuel oil bunker (cub. m) 1240
Fresh water tanks (cub. m) -
Speed (kn) 15.5
Number of beds for crew 77
Number of units 11
Start of building 1973
Finish of building 1974
Built by Stocznia Gdanska im. Lenina, Gdansk, Poland
Notices:
        - During construction of a series of vessels of one project, in their design some changes can be made and the above-stated characteristics can be changed insignificantly.
        - The above-stated characteristics, in most cases, are taken on the first vessel in class. In brackets can be shown other variants of the given characteristic.