"Rodina" type Large Size Tuna Purse Seiner (project B-406)

"Rodina" type Large Size Tuna Purse Seiner (project B-406)


LIST OF VESSELS 


 In total 10 units were built from 1979 to 1981 at Poland.
Purpose of the vessel:     - caching of tuna with purse seine
    - production of frozen tuna
    - transport of processed cargo to port
Length OA (m) 85.00
Length BP (m) 75.00
Breadth extreme (m) -
Molded breadth (m) 15.00
Depth to upper deck (m) 9.20
Load draught, average (m) 5.955
Displacement (tonnes) 4059
Deadweight (tonnes) 1745
Gross tonnage / Net tonnage (register tons)
2634 / 1418
Carrying capacity (tonnes) 1040
Main engines:

    - Main engine number, power (Bhp each)
1*5200
    - Main engine model
Zgoda-Sulzer 8ZL 40/48
    - Speed of rotation (r.p.m.)
530
Shaft generators:

    - Shaft generator  model
n/a
    - Shaft generators number, power (kW each)
n/a
    - Speed of rotation (r.p.m.)
n/a
    - Rated voltage (V)
n/a
Auxiliary diesel generators:

    - Diesel engine number, power (Bhp each)
3*1100
    - Speed of rotation (r.p.m.)
750
    - Engine model
6AL 25/30
    - Generators number, power (kW each)
3*640
    - Generator model
GD8-800-50
    - Rated voltage (V)
400
Emergency diesel generator:
    - Diesel engine power (Bhp)
150
    - Speed of rotation (r.p.m.)
1500
    - Engine model
6Ch 15/18
    - Generator power (kW)
100
    - Generator model
MSSF 92-4
    - Rated voltage (V)
400
Fish processing plant capacity:
    - Frozen tuna (tonnes/24 hrs)
30
Refrigerated cargo spaces number, total cubic capacity (cub. m) 3*1615.1
Cooled replaceable diesel oil tanks number, total cubic capacity (cub. m) 4*148.6
Ref. temperatures (C) -25
Refrigerants Freon 22
Derricks number, lifting capacity (tonnes) 1*1.25; 1*1.5; 4*3.0; 1*15.0
Diesel oil tanks (tonnes) 480
Heavy fuel oil tanks (tonnes) 390
Fresh water tanks (tonnes)
-
Speed (kn) 15.30
Number of beds for crew 38
Number of units 10
Start of building 1979
Finish of building 1981
Built by Stocznia Polnocna, Gdansk, Poland
Notices:
        - During construction of a series of vessels of one project, in their design some changes can be made and the above-stated characteristics can be changed insignificantly.
        - The above-stated characteristics are taken on the first vessel in class (source - Fishing industry fleet. Reference book. 1990). In brackets can be shown other variants of the given characteristic.
<UP>


free counters